This project involved a turnkey engineering solution for the vertical expansion of the City General Hospital, adding a new 200-bed ICU wing. The primary objective was to create a state-of-the-art, compliant, and patient-safe critical care environment without disrupting the 24/7 operations of the existing hospital below.
Client
City General Hospital
Location
Metropolis, USA
Year
2023
Value
$4.2M
A Complex Engineering Puzzle
The core challenge was to install highly sensitive medical gas and HVAC systems in a live hospital environment. This required meticulous planning to manage infection control, noise, vibration, and ensure zero downtime for the active floors.
Innovative & Efficient
Our team utilized Building Information Modeling (BIM) for clash-free design and off-site prefabrication of major piping modules. A phased installation plan with strict containment protocols and negative air pressure systems was implemented to isolate the construction zone completely.
Key Project Outcomes
Delivered project 10% ahead of the 36-week schedule.
Achieved zero unscheduled disruptions to hospital operations.
The facility passed all third-party validation and FDA regulatory checks on the first attempt.
Installed systems resulted in a 15% increase in energy efficiency compared to the old wing.
“Their professionalism and expertise in a live hospital setting were remarkable. The project was executed flawlessly, and their commitment to safety and compliance was evident at every stage.”