City General Hospital ICU Expansion
Healthcare

City General Hospital ICU Expansion

This project involved a turnkey engineering solution for the vertical expansion of the City General Hospital, adding a new 200-bed ICU wing. The primary objective was to create a state-of-the-art, compliant, and patient-safe critical care environment without disrupting the 24/7 operations of the existing hospital below.

Client

City General Hospital

Location

Metropolis, USA

Year

2023

Value

$4.2M

The Challenge

A Complex Engineering Puzzle

The core challenge was to install highly sensitive medical gas and HVAC systems in a live hospital environment. This required meticulous planning to manage infection control, noise, vibration, and ensure zero downtime for the active floors.

Our Solution

Innovative & Efficient

Our team utilized Building Information Modeling (BIM) for clash-free design and off-site prefabrication of major piping modules. A phased installation plan with strict containment protocols and negative air pressure systems was implemented to isolate the construction zone completely.

Services Provided

  • Medical Gas Pipeline Installation (NFPA 99)
  • Cleanroom HVAC & Air Filtration (ISO 7)
  • Building Management System (BMS) Integration
  • Project Management & Validation (IQ/OQ)
  • Fire Suppression Systems

Results

Key Project Outcomes

Delivered project 10% ahead of the 36-week schedule.

Achieved zero unscheduled disruptions to hospital operations.

The facility passed all third-party validation and FDA regulatory checks on the first attempt.

Installed systems resulted in a 15% increase in energy efficiency compared to the old wing.

Their professionalism and expertise in a live hospital setting were remarkable. The project was executed flawlessly, and their commitment to safety and compliance was evident at every stage.

Mark Chen
Director of Facilities, City General Hospital