GMP-Compliant MEP Systems for Medtronic Karachi
Pharmaceuticals & Medical Devices

GMP-Compliant MEP Systems for Medtronic Karachi

Delivered a fully integrated HVAC, Fire Safety, and Building Automation System for Medtronic's critical storage and distribution center in Karachi. The project's goal was to establish a GMP-compliant environment with precise controls, ensuring product integrity and ultimate operational safety.

Client

Medtronic Pakistan (Pvt.) Ltd.

Location

Karachi, Pakistan

Year

2023

The Challenge

A Complex Engineering Puzzle

The core technical challenge was to engineer an MEP system that could guarantee strict adherence to the environmental conditions—temperature, humidity, and air purity—mandated for storing high-value medical devices. The system required flawless integration to ensure that life safety protocols and environmental controls worked in perfect harmony without failure points.

Our Solution

Innovative & Efficient

We designed and deployed a specialized HVAC system featuring HEPA filtration and pressure zoning to create a certifiable clean environment. This was coupled with an intelligent, addressable fire detection system and a clean agent fire suppression solution for sensitive areas. The entire infrastructure was unified under a Siemens Building Automation System (BAS), providing a centralized platform for real-time monitoring, data logging for regulatory audits, and automated environmental control.

Services Provided

  • Precision HVAC & Cleanroom Solutions
  • Addressable Fire Alarm & Suppression
  • Building Automation System (BAS) Implementation
  • Environmental Monitoring & Control
  • Project Management

Results

Key Project Outcomes

Achieved and validated 100% compliance with stringent GMP and international cleanroom standards.

Improved energy efficiency by over 20% by leveraging the BAS to optimize HVAC runtime and environmental loads.

Eliminated risks of product spoilage by ensuring zero deviations from the required storage climate conditions.

Provided a comprehensive audit trail through the BAS, simplifying regulatory compliance and reporting.

Their team understood the critical nature of our operations and delivered a robust, integrated system that meets our global quality standards. The level of precision in the environmental controls is outstanding, and the project was managed flawlessly from start to finish.

Syed Hassan Ali
Head of Operations