J.S. Engineers Logo
Premier Textiles Energy Modernization
Textiles

Premier Textiles Energy Modernization

Premier Textiles, a leading denim manufacturer, engaged us to overhaul their aging and inefficient utility systems. The project focused on reducing their high operational costs and improving fabric quality through better climate control.

Client

Premier Textiles Ltd.

Location

Industrial City, USA

Year

2022

Value

$1.8M

The Challenge

A Complex Engineering Puzzle

The primary challenge was to retrofit a new, centralized HVAC and humidification system into a fully operational weaving plant without halting production for an extended period.

Our Solution

Innovative & Efficient

We engineered a high-efficiency HVAC system using VFD-controlled motors and a PLC-based control panel for precise humidity management. The installation was executed in phases during scheduled maintenance shutdowns to eliminate production loss.

Services Provided

  • Industrial HVAC & Humidification
  • PLC & Automation Systems
  • Energy Auditing & Management
  • Compressed Air Systems

Results

Key Project Outcomes

Reduced plant-wide HVAC energy consumption by over 35%.

Increased loom efficiency by 8% by significantly reducing yarn breakage.

Achieved a consistent product quality, lowering the rejection rate by 15%.

The project achieved a full return on investment (ROI) in just 2.5 years.

The results speak for themselves. Our energy bills are down, our output is up, and the quality is more consistent than ever. This was a fantastic investment and a brilliantly managed project.

Hassan Ahmed
Director of Operations, Premier Textiles Ltd.

Visuals

Project Gallery

Gallery image 1
Gallery image 2
Gallery image 3