A strategic HVAC modernization project for the Faysal Bank corporate tower, focused on replacing an outdated, monolithic cooling system with an intelligent, zoned climate control solution. The primary objectives were to drastically reduce energy consumption, enhance employee comfort and productivity, and provide flexible, adaptable temperature control for different departments.

Client

Faysal Bank Limited

Location

Karachi, Pakistan

Year

2024

The Challenge

A Complex Engineering Puzzle

The bank's main corporate building was served by an aging central HVAC system that operated at a single capacity, leading to significant energy waste during off-peak hours and inconsistent temperatures across its many diverse spaces—from high-occupancy trading floors to executive offices. The key challenge was to implement a modern, granular system within a high-security, live banking environment without any disruption to critical operations.

Our Solution

Innovative & Efficient

Our team designed and deployed a state-of-the-art Variable Refrigerant Flow (VRF) system across the entire tower. This technology allows for the creation of numerous independent climate zones, enabling precise temperature control for individual floors, departments, or even specific rooms. The system intelligently modulates refrigerant flow based on the real-time thermal load of each zone, ensuring optimal energy use. The entire network was integrated into a central Building Management System (BMS), giving the facilities team unprecedented control and insight into the building's energy performance.

Services Provided

  • Variable Refrigerant Flow (VRF) System Design & Installation
  • Building Management System (BMS) Integration
  • Energy Efficiency Auditing & Consulting
  • Zoned Climate Control Implementation
  • Project Management in a High-Security Environment

Results

Key Project Outcomes

Achieved a 45% reduction in overall HVAC-related electricity costs, delivering a rapid return on investment.

Eliminated employee complaints regarding thermal comfort by providing consistent, department-specific temperature control.

Enabled 'after-hours' air conditioning for specific departments without needing to cool the entire building, further optimizing energy use.

Completed the entire, complex installation with zero interruptions to the bank's daily business operations.

The transformation has been remarkable. We've moved from a costly, one-size-fits-all system to an intelligent, flexible solution that has slashed our operational costs. Their team's planning and execution within our live headquarters were seamless and highly professional. It's a significant upgrade for both our bottom line and our work environment.

Adnan Chishti
Head of Administration & Facilities

Visuals

Project Gallery

Gallery image 1
Gallery image 2
Gallery image 3
Gallery image 4