Delivered a complete, fully compliant, and robust fire safety and plumbing infrastructure for the new 20-story Al Basit Grand Tower, a mixed-use residential and commercial building. The project scope included the entire wet and dry fire protection system and the high-pressure water supply and drainage systems, engineered for a high-density urban environment.

Client

Al Basit Builders & Developers

Location

Karachi, Pakistan

Year

2024

The Challenge

A Complex Engineering Puzzle

The primary challenge was designing a fire protection system for a high-rise structure that met the stringent requirements of the Karachi Building Control Authority (KBCA) and Civil Defense, including dedicated fire water storage and multi-zone pressurization. For the plumbing, the challenge was to engineer a system that could consistently deliver high water pressure to the upper floors and manage the high-volume drainage and waste from over 150 residential apartments and ground-floor commercial shops without risk of failure.

Our Solution

Innovative & Efficient

Our team engineered and installed a comprehensive fire safety system, including dedicated fire pumps, a wet riser for firefighting on all floors, and an automated sprinkler and smoke detection network. For the plumbing, we designed a hydro-pneumatic booster system to ensure adequate water pressure at all levels. A separate, large-diameter uPVC drainage and vent stack system was installed to handle the high load, preventing backflow and ensuring efficient, hygienic waste disposal for the entire tower.

Services Provided

  • High-Rise Fire Suppression & Sprinkler Systems
  • Plumbing & Public Health Engineering
  • Fire Pump & Water Storage Solutions
  • Pressurized Water Distribution Systems
  • Project Management & Authority Liaising

Results

Key Project Outcomes

Received all necessary No Objection Certificates (NOCs) from KBCA and Civil Defense for fire safety.

Ensured a reliable and high-pressure water supply to all residential and commercial units, up to the 20th floor.

Engineered a zero-failure drainage system capable of handling peak load from hundreds of occupants.

Delivered a safe, compliant, and fully functional MEP system, adding significant value and safety to the property.

For a high-rise project like Al Basit Grand, safety and long-term reliability are paramount. Their team's expertise in designing compliant fire and plumbing systems for tall buildings was invaluable. They delivered a high-quality installation and expertly managed all authority approvals, which was critical for our project's success.