JS Engineers MEP Contractor Company Logo
Specialized HVAC & Fire Safety for Atrium Mall & Cinemas, Karachi
Retail & Entertainment

Specialized HVAC & Fire Safety for Atrium Mall & Cinemas, Karachi

Delivered a specialized HVAC and Fire Safety system for Atrium Mall, with a primary focus on the high-density occupancy requirements of its multiplex cinemas. The project ensured superior indoor air quality and silent operation for the theaters, alongside a fully compliant fire protection system for the entire facility.

Client

Atrium Mall

Location

Karachi, Pakistan

Year

2022

The Challenge

A Complex Engineering Puzzle

The main challenge was the cinema complex. Each theater required a high volume of fresh air (high air change rate) to maintain comfort for hundreds of patrons in an enclosed space, and the HVAC system had to be acoustically treated to be completely silent. The fire safety system needed to address the unique risks of a high-occupancy entertainment venue.

Our Solution

Innovative & Efficient

We designed a dedicated HVAC system for the cinemas using low-noise Air Handling Units (AHUs) with high-efficiency filtration and sound attenuators in the ductwork. For fire safety, we installed an addressable fire alarm system with voice evacuation capabilities and a comprehensive sprinkler system designed for the unique layout of stadium-seating theaters.

Services Provided

  • Acoustically-Treated HVAC Systems
  • Firefighting & Sprinkler Systems
  • Ventilation & Air Quality Management
  • Voice Evacuation & Fire Alarm Systems
  • Project Management

Results

Key Project Outcomes

Engineered a silent HVAC system, enhancing the cinematic experience for moviegoers.

Provided superior indoor air quality in high-occupancy cinema halls, meeting international standards.

Achieved full compliance with fire and life safety codes for entertainment venues.

Delivered a reliable and efficient MEP backbone for a premier city-center mall.

The cinema is our main attraction, and the guest experience has to be perfect. Their team's expertise in acoustic HVAC design was critical. They delivered a system that is both powerful and completely silent. Their attention to detail on safety was also second to none.

Mr. Danish Adamjee
Managing Director, Atrium Mall

Visuals

Project Gallery

Gallery image 1
Gallery image 2
Gallery image 3
Gallery image 4