Comprehensive HVAC & Fire Safety Systems for California Pizza's Karachi Flagship Store

Engineered and installed a complete MEP solution for California Pizza's new flagship restaurant in Karachi, focusing on high-performance HVAC to combat the city's climate, specialized kitchen ventilation, and a fully compliant, authority-approved fire safety system.

Client

California Pizza

Location

Karachi, Pakistan

Year

2024

The Challenge

A Complex Engineering Puzzle

The primary challenge was designing an HVAC system capable of maintaining a cool and comfortable dining environment despite Karachi's high heat and humidity, while managing the intense heat load from the kitchen. It was also critical to design and get approval for a fire suppression and alarm system that met the stringent safety standards of the Karachi Building Control Authority (KBCA) and Civil Defense for a high-traffic commercial eatery.

Our Solution

Innovative & Efficient

We implemented a high-efficiency VRF system with a capacity calculated to handle extreme ambient temperatures, ensuring consistent cooling in the dining area. A dedicated kitchen ventilation system, featuring stainless steel exhaust hoods and a fresh air handling unit (FAHU), was installed to ensure a safe and comfortable environment for the staff. For fire safety, we deployed an automated wet chemical suppression system for the kitchen cooking line, integrated with a comprehensive addressable fire alarm and sprinkler system throughout the facility.

Services Provided

  • Commercial Kitchen Ventilation & Exhaust
  • High-Performance HVAC System (VRF) Installation
  • Fire Suppression & Sprinkler Systems
  • Addressable Fire Alarm & Detection System
  • Project Management & Authority Liaising

Results

Key Project Outcomes

Successfully met all Karachi Building Control Authority (KBCA) and Civil Defense requirements for fire safety.

Engineered a climate-controlled dining environment, maintaining comfort despite Karachi's high ambient temperatures.

Delivered a safe and significantly cooler working environment for the kitchen staff, improving operational efficiency.

Ensured project completion aligned with the brand's aggressive rollout schedule for its new flagship Karachi store.

Launching in Karachi comes with its own set of challenges, especially regarding MEP and building codes. Their team navigated the entire process flawlessly, delivering a top-tier HVAC and fire safety system. They are professional, technically sound, and an essential partner for our expansion in the southern region.

Ms. Sarah Ahmed
Projects Director, California Pizza (South Region)