JS Engineers MEP Contractor Company Logo
Integrated HVAC & Fire Safety for Mega Mall & Residency, Karachi
Mixed-Use High-Rise

Integrated HVAC & Fire Safety for Mega Mall & Residency, Karachi

Delivered a comprehensive, dual-purpose HVAC and Fire Safety system for the landmark Mega Mall & Residency, a mixed-use development combining a high-end shopping mall with luxury residential towers. The project was engineered to meet the distinct and demanding MEP requirements of both retail and residential occupants within a single, integrated infrastructure.

Client

Apex Builders & Developers

Location

Karachi, Pakistan

Year

2023

The Challenge

A Complex Engineering Puzzle

The core challenge was the complexity of a mixed-use high-rise. The HVAC system needed to serve the high-cooling demand of the retail mall during the day and the different, 24/7 comfort needs of the residential tower, all while ensuring acoustic isolation. The fire safety system required a unified yet zoned approach to address the different risks and evacuation strategies for a high-traffic public mall versus private residences.

Our Solution

Innovative & Efficient

We implemented a centralized, high-efficiency chiller plant with a four-pipe system, allowing for simultaneous cooling and heating to serve the diverse needs of the complex. Dedicated Air Handling Units (AHUs) and Fan Coil Units (FCUs) with BTU meters were installed for independent climate control and energy billing for each apartment and retail unit. The fire safety system features an integrated, addressable fire alarm network with a robust sprinkler system and dedicated smoke pressurization for the residential tower's emergency escape routes.

Services Provided

  • HVAC for Mixed-Use Developments
  • High-Rise Firefighting & Life Safety Systems
  • Energy Metering (BTU Meters) for Billing
  • Acoustic & Vibration Control for MEP Systems
  • Project Management

Results

Key Project Outcomes

Successfully engineered a zoned HVAC system providing optimal, independent comfort for both retail and residential occupants.

Achieved 100% compliance with the latest fire and life safety codes for mixed-use high-rise buildings in Pakistan.

Ensured precise and fair energy billing through the installation of over 400 individual BTU meters.

Delivered a robust, unified MEP system, enhancing the safety, comfort, and value of the entire development.

A mixed-use tower like this is incredibly complex from an engineering standpoint. Their team's ability to design an integrated MEP system that perfectly serves both our shoppers and our residents was exceptional. Their solution for independent energy billing and robust fire safety was a critical factor in the project's success.

Mr. Salman Khan
Director of Projects, Apex Developers

Visuals

Project Gallery

Gallery image 1
Gallery image 2
Gallery image 3
Gallery image 4