JS Engineers MEP Contractor Company Logo
Integrated HVAC & Fire Safety Retrofit for Ocean Tower & Mall, Karachi
Commercial & Retail

Integrated HVAC & Fire Safety Retrofit for Ocean Tower & Mall, Karachi

Executed a comprehensive HVAC and Fire Safety system upgrade for the iconic Ocean Tower, a 393-foot high-rise containing a major shopping mall and corporate offices. The project focused on enhancing energy efficiency, improving climate control across diverse zones (retail, offices, food courts), and modernizing the fire protection systems to meet the latest NFPA and local authority standards.

Client

Ocean Tower and Mall Management

Location

Karachi, Pakistan

Year

2023

The Challenge

A Complex Engineering Puzzle

The primary challenge was executing a large-scale MEP retrofit within a fully operational, high-traffic skyscraper. For HVAC, the goal was to manage the immense cooling load and corrosive sea air of Karachi while creating distinct climate zones. For fire safety, the challenge was to upgrade the entire high-rise network—including sprinklers, alarms, and smoke management—to the latest codes without disrupting daily business for hundreds of tenants and thousands of visitors.

Our Solution

Innovative & Efficient

Our team engineered a phased, zone-by-zone retrofit. For HVAC, we installed high-efficiency, anti-corrosion coated water-cooled chillers and refurbished the Air Handling Units (AHUs) with smart controls to optimize performance. The fire safety solution involved upgrading the entire building to an intelligent, addressable fire alarm system, retrofitting sprinklers where required, and implementing a state-of-the-art smoke control and staircase pressurization system, ensuring full compliance with the Building Code of Pakistan-Fire Safety Provisions.

Services Provided

  • High-Rise HVAC System Retrofitting
  • Fire Safety System & Code Compliance Upgrade
  • Addressable Fire Alarm & Detection System
  • Smoke Control & Stairwell Pressurization
  • Project Management & Live Environment Execution

Results

Key Project Outcomes

Reduced overall energy consumption by 22% through the installation of high-efficiency chillers and smart controls.

Achieved 100% compliance with the latest fire safety codes for high-rise buildings, ensuring enhanced safety for occupants.

Completed the entire complex retrofit with zero disruption to the mall or corporate office operations.

Improved indoor air quality and provided consistent, zoned temperature control throughout the 30-floor building.

Upgrading the MEP systems in a live, iconic building like Ocean Tower is an immense challenge. Their team's meticulous planning and technical expertise were flawless. They delivered a modern, efficient, and safer environment for our tenants and visitors, all without impacting our daily operations. They are true professionals in high-rise building solutions.

Mr. Suleman Ahmed
Chief Engineer, Ocean Tower

Visuals

Project Gallery

Gallery image 1
Gallery image 2
Gallery image 3
Gallery image 4