JS Engineers MEP Contractor Company Logo
All-Weather HVAC & Firefighting Systems for Giga Mall, Islamabad
Retail & Commercial

All-Weather HVAC & Firefighting Systems for Giga Mall, Islamabad

Engineered and installed a comprehensive, all-weather HVAC and Firefighting system for Giga Mall, a major shopping destination in the capital. The project was designed to provide energy-efficient heating and cooling to cope with Islamabad's varied climate and to implement a robust fire safety infrastructure.

Client

Giga Group

Location

Islamabad, Pakistan

Year

2023

The Challenge

A Complex Engineering Puzzle

The key challenge was Islamabad's climate, which features both scorching summers and cold winters. The HVAC system needed to provide both effective cooling and heating efficiently, often on the same day during transitional seasons. The fire system had to meet the stringent safety standards of the Capital Development Authority (CDA).

Our Solution

Innovative & Efficient

We installed a four-pipe central plant system with both chillers and boilers, allowing for simultaneous heating and cooling across different zones of the mall as required. This provided ultimate flexibility and energy efficiency. The fire safety system included a complete wet-riser, sprinkler, and hydrant system, fully compliant with CDA regulations, ensuring a rapid response capability.

Services Provided

  • All-Weather HVAC (Heating & Cooling)
  • Firefighting (Sprinklers & Hydrants)
  • Central Chiller & Boiler Plant
  • MEP Systems for Large Mixed-Use Developments
  • Project Management & CDA Liaising

Results

Key Project Outcomes

Delivered an energy-efficient, all-weather HVAC solution perfectly suited for Islamabad's climate.

Achieved 100% compliance with all Capital Development Authority (CDA) fire and safety regulations.

Provided a consistently comfortable shopping environment year-round, enhancing visitor experience.

Installed a robust and reliable MEP system for one of Islamabad's largest retail malls.

Giga Mall required an MEP system that could perform flawlessly in both summer and winter. The four-pipe HVAC solution they provided has been incredibly effective and efficient. Their team managed the complex installation and all authority approvals with great professionalism.

Haji Amin Pardesi Giga
Chairman, Giga Group

Visuals

Project Gallery

Gallery image 1
Gallery image 2
Gallery image 3
Gallery image 4