JS Engineers MEP Contractor Company Logo
Integrated HVAC & Fire Safety for Safa Gold Mall, Islamabad
Retail & Commercial

Integrated HVAC & Fire Safety for Safa Gold Mall, Islamabad

Engineered and installed a fully integrated HVAC and Firefighting system for Safa Gold Mall, a premier high-end shopping destination in the heart of Islamabad. The project focused on providing a premium indoor climate and a robust safety system, with all MEP services carefully concealed to match the mall's luxury aesthetic.

Client

Safa Gold Mall Management

Location

Islamabad, Pakistan

Year

2023

The Challenge

A Complex Engineering Puzzle

The primary challenge was fitting the extensive MEP systems required for a luxury mall into a relatively compact, vertical building footprint without compromising on ceiling height or aesthetics. The HVAC system had to be silent and invisible, and the fire safety system needed to be comprehensive yet discreet.

Our Solution

Innovative & Efficient

We utilized a space-saving VRF system for HVAC, which offers excellent zonal control and requires less ductwork than traditional systems. This allowed for maximum ceiling height. For fire safety, we used concealed sprinkler heads that sit flush with the ceiling, and integrated the fire alarm speakers and strobes into the interior design, ensuring safety without visual clutter.

Services Provided

  • Aesthetic-Driven HVAC Design (VRF)
  • Firefighting & Concealed Sprinkler Systems
  • MEP Space-Saving Solutions
  • Addressable Fire Alarm System
  • Project Management

Results

Key Project Outcomes

Delivered a highly effective MEP system within a constrained building footprint.

Preserved the mall's luxury aesthetic through the use of concealed HVAC units and fire safety devices.

Achieved full compliance with all Capital Development Authority (CDA) safety regulations.

Provided a silent, comfortable, and safe environment befitting a high-end retail brand.

At Safa Gold Mall, the luxury experience is in the details. Their team understood our aesthetic vision and engineered an MEP system that is completely invisible to our patrons. Their innovative approach to concealing the equipment was crucial to the project's success.

Mr. Rana Abdul Qayyum
CEO, Safa Gold Mall

Visuals

Project Gallery

Gallery image 1
Gallery image 2
Gallery image 3
Gallery image 4