JS Engineers MEP Contractor Company Logo
Robust HVAC & Plumbing Solutions for Kolachi Restaurant's Seaside Location
Hospitality

Robust HVAC & Plumbing Solutions for Kolachi Restaurant's Seaside Location

Engineered and executed a comprehensive HVAC and plumbing system for Kolachi Restaurant, one of Pakistan's busiest dining destinations. The project focused on delivering powerful, corrosion-resistant air conditioning to combat the harsh seaside environment and a high-capacity plumbing system to handle immense daily footfall.

Client

Kolachi Restaurant (Do Darya)

Location

Karachi, Pakistan

Year

2023

The Challenge

A Complex Engineering Puzzle

The primary challenge was the restaurant's location on the Do Darya coastline, which exposed all outdoor HVAC equipment to highly corrosive, salty air, leading to rapid deterioration and failure. Furthermore, the plumbing and drainage systems needed to be exceptionally robust to manage the massive water demand and waste output from the kitchens and restrooms of a restaurant serving thousands of patrons daily, without any risk of blockages or downtime.

Our Solution

Innovative & Efficient

For the HVAC system, we installed high-efficiency VRF units with specialized anti-corrosion coatings (hydrophilic fins) on all outdoor condensers to withstand the saline environment. For the plumbing, we designed a high-capacity, gravity-fed system using durable PPR-C pipes and installed a multi-stage, industrial-grade grease trap and a dedicated water filtration plant to ensure system longevity, hygiene, and uninterrupted service.

Services Provided

  • Corrosion-Resistant HVAC System Design & Installation
  • Commercial Plumbing & High-Capacity Drainage Systems
  • Water Filtration & Pumping Solutions
  • Kitchen Grease Management Systems
  • Project Management

Results

Key Project Outcomes

Extended the operational lifespan of outdoor HVAC units by over 40% through specialized anti-corrosion treatment.

Engineered a zero-failure plumbing and drainage system, eliminating the risk of blockages during peak operational hours.

Maintained a consistently comfortable and premium dining atmosphere, crucial for the restaurant's high-end brand image.

Ensured a continuous supply of filtered, potable water, meeting all public health and safety standards.

Operating by the sea presents unique technical challenges that few can handle. Their team engineered an MEP system that has proven to be both powerful and incredibly durable. The reliability of their plumbing and HVAC work is a key reason we can serve thousands of guests seamlessly every single night.

Mr. Owais Ali
Director of Operations, Kolachi Restaurant

Visuals

Project Gallery

Gallery image 1
Gallery image 2
Gallery image 3
Gallery image 4