Executed a comprehensive HVAC system overhaul for the prestigious Heritage Luxury Hotel, replacing an aging, inefficient chiller system with a state-of-the-art VRF solution. The primary objective was to drastically reduce energy consumption while enhancing guest comfort and system controllability without disrupting hotel operations.

Client

Heritage Luxury Hotel

Location

Karachi, Pakistan

Year

2024

The Challenge

A Complex Engineering Puzzle

The hotel's existing HVAC system was a major operational expense, consuming excessive electricity and requiring frequent, costly maintenance. The core challenge was to perform a complete system retrofit in a fully operational luxury hotel, ensuring that the guest experience remained seamless and that the new system provided silent, individualized room temperature control to meet the highest standards of comfort.

Our Solution

Innovative & Efficient

Our engineering team designed and deployed a high-efficiency Variable Refrigerant Flow (VRF) system. The solution involved a phased installation approach, floor by floor, during low-occupancy periods to ensure zero disruption. We integrated the entire VRF system into the hotel's Building Management System (BMS) for centralized monitoring, control, and energy optimization, using concealed indoor units to maintain the hotel's premium aesthetics.

Services Provided

  • HVAC System Design & VRF Implementation
  • Building Management System (BMS) Integration
  • Energy Efficiency Auditing & Consulting
  • Ventilation & Fresh Air Handling Unit (FAHU) Installation
  • Project Management

Results

Key Project Outcomes

Reduced HVAC-related energy costs by over 35%, delivering significant operational savings.

Enhanced guest satisfaction by providing silent operation and precise, individual room climate control.

Achieved 100% project completion with zero disruption to hotel operations or guest services.

Improved maintenance efficiency and system reliability through centralized BMS monitoring and diagnostics.

The professionalism and meticulous planning demonstrated by the team were exceptional. They delivered a cutting-edge HVAC system that has not only lowered our running costs but has also elevated our guest experience. The entire project was completed seamlessly without a single complaint from our guests.

Mr. Hassan Malik
General Manager, Heritage Luxury Hotel

Visuals

Project Gallery

Gallery image 1
Gallery image 2
Gallery image 3
Gallery image 4