
Delivered a fully integrated MEP solution for The Centaurus, a landmark mixed-use development featuring a premium shopping mall, corporate offices, and residential towers. The project included a complex HVAC system, a high-rise fire safety network, and a sophisticated Building Automation System to manage the entire complex.
Client
The Centaurus
Location
Islamabad, Pakistan
Year
2023
A Complex Engineering Puzzle
The primary challenge was the complexity of a mixed-use high-rise. Each component—retail, corporate, and residential—had vastly different MEP requirements that needed to be served by a central plant but controlled independently. Integrating the fire and life safety systems across these different occupancies into a single, cohesive emergency response plan was a critical and complex task.
Innovative & Efficient
We engineered a centralized utility plant with independent controls for each tower. A powerful Building Automation System (BAS) was the core of the solution, providing zoned HVAC control and integrating the fire alarm systems from all three towers into one central security command center. This allows for unified monitoring and a coordinated emergency response while optimizing energy use across the entire development.
Key Project Outcomes
Successfully delivered a complex, integrated MEP system for a landmark mixed-use high-rise.
Provided a unified building management platform, enhancing operational efficiency and safety.
Achieved full compliance with CDA's stringent fire and life safety codes for high-rise buildings.
Engineered distinct, optimized climate zones for retail, corporate, and residential occupants.

“The Centaurus is more than a mall; it's a vertical city. The complexity of its MEP systems is immense. Their team delivered a brilliantly integrated solution that allows us to manage this entire landmark property efficiently and safely from a single point of control. Their expertise is truly world-class.”
Project Gallery



