A comprehensive HVAC system upgrade for the JS Bank corporate headquarters in Karachi. The project's dual focus was to significantly reduce operational energy costs and enhance the workplace environment for employees, while also providing precision cooling for the bank's mission-critical data center.
Client
JS Bank
Location
Karachi, Pakistan
Year
2024
A Complex Engineering Puzzle
The primary challenge was to replace an aging, inefficient chiller-based HVAC system, which was resulting in excessive energy expenditure and inconsistent cooling across the high-rise building. The entire project had to be executed in a live, 24/7 operational banking headquarters without causing any disruption to daily operations or compromising the stringent cooling requirements of their Tier-III data center.
Innovative & Efficient
Our solution involved a phased replacement of the old system with a high-efficiency, water-cooled magnetic bearing (Maglev) chiller plant, significantly reducing the building's PUE (Power Usage Effectiveness). The entire system was integrated into a sophisticated Building Automation System (BAS) for real-time monitoring and load optimization. For the critical data center, we deployed a dedicated, N+1 redundant CRAC (Computer Room Air Conditioning) unit system to ensure uninterrupted, precision cooling and humidity control, completely independent of the main building's comfort cooling system.
Key Project Outcomes
Achieved a 35% reduction in HVAC-related energy consumption, leading to significant annual operational cost savings.
Guaranteed 100% uptime for the data center's cooling infrastructure with the N+1 redundant system.
Improved employee comfort and productivity by maintaining consistent ambient temperatures across all floors.
Completed the entire multi-phase project with zero unplanned downtime for the bank's critical or general operations.

“Their team delivered a remarkable upgrade with zero disruption to our 24/7 operations. The energy savings have surpassed our projections, and the reliability of the new system, especially for our data center, is world-class. It was a seamless execution from a highly professional team.”