
Provided a comprehensive MEP solution for the prestigious Packages Mall, Lahore, including HVAC, Firefighting, and all associated Mechanical Utilities. The project focused on delivering a highly reliable and robust central utility infrastructure to support the operations of numerous international flagship stores.
Client
Packages Limited
Location
Lahore, Pakistan
Year
2022
A Complex Engineering Puzzle
The main challenge was the reliability demanded by high-value international tenants. The mechanical utilities—particularly the central chiller plant and water distribution—required built-in redundancy to guarantee zero downtime, as any service interruption could lead to significant revenue loss for the tenants and damage the mall's premium reputation.
Innovative & Efficient
We designed and installed a high-efficiency central energy plant with N+1 redundancy on all critical components, including chillers, pumps, and cooling towers, ensuring continuous operation even during maintenance. The firefighting system was designed to the highest international standards (NFPA), and the mechanical utilities work included a comprehensive water management and distribution network for the entire complex.
Key Project Outcomes
Delivered a mission-critical central utility plant with 99.9% uptime, meeting the demands of international retail brands.
Achieved over 20% greater energy efficiency compared to conventional designs.
Provided a robust and fully compliant fire and life safety system for a premier retail destination.
Successfully managed the complete mechanical utilities scope for a large-scale, landmark project.

“Packages Mall is home to top international brands that demand operational excellence. The MEP infrastructure is the backbone of that experience. Their team engineered a central plant that is both incredibly reliable and efficient, which has been a cornerstone of our success.”
Project Gallery



